In the area of Frankfurt am Main we have pulled about 900 tons of double U-profiles with a length of 17.0m out of the ground in the last weeks.
We did this with our ABI TM22 + 30VV machine, the site was very tight with the new building on one side and the high dyke garden of the neighbor’s on the other side.
A project with many challenges in terms of logistics and very limited space.