For the exhibition of the ship ‘Peking’ it was needed to secure and reinforce the Bremer Kai in Hamburg. To do so we installed two steel mooring posts that serve to moor the ship so that it can be admired in the German Port Museum in the future and the ship is secured in the event of storm surges.
The tubes with a length of 37m, a diameter of 1500mm and a wall thickness of 16mm-28mm, were driven up to 17m deep into the ground. To do this the best way possible we used our 150M + 1600PP into the silt of the Hansa harbor.